Holloway U.S. Courthouse & Post Office 

fs3H is the Construction Manager as Advisor for GSA Region 7 for the repair and alteration of the Holloway U.S. Courthouse & Post Office/Courthouse.

Client

GSA, Region 7

Services

Construction Management, Design & Constructability Reviews, Cost Estimating, Site Logistics Analysis, Phasing Assessment, Risk Management, Value Engineering, Inspection and Testing, Scheduling, Document Control, Commissioning Oversight

Project Size

303,950 Sq. Ft. (FOB) + 154,400 Sq. Ft. (POB)

Location

Oklahoma City, OK

fs3H has been selected to provide CMa and oversee commissioning services for the $112 million repair and alteration of the William J. Holloway, Jr. U.S. Courthouse and the U.S. Post Office/Courthouse in Oklahoma City, OK.

The project will include reconfiguration of underground parking areas, building envelope upgrades, improvements to safety systems, and exterior stone restoration. fs3|Hodges is the U.S. Government’s Construction Manager as advisor (CMa). As the Owner’s Representative, we are responsible for pre-construction services including design/constructability reviews, cost estimating, site logistics analysis, work phasing assessment, risk assessment and value engineering. We will provide on-site CM, inspection and testing, cost/schedule control, document control, and oversee commissioning services.